construction waste crusher operation specification

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

construction waste crusher operation specification

hijuly
Our company is a manufacturer of rock and mineral processing equipment. Since the late twentieth Century, it has installed tens of thousands of sets of crushing equipment or crushing production lines all over the world. The <a href="http://www.miningscrusher.com/solution/construction-waste-crusher.html " target="_blank">construction waste crusher is a new crusher developed by our company after the traditional crusher. The product is a perfect combination of modern science and technology and production practice. It is a product of high efficiency crushing hard and strong corrosive materials.
Operation specification:
1. after the normal operation of the crusher, the material can be fed;
2. materials to be broken into the crusher chamber should be evenly joined, should avoid lateral feeding or stacked feeding, so as to avoid unilateral overload or overload;
3. normal operation, the bearing temperature rise should not exceed 30 degrees, the temperature shall not exceed 70 degrees. When the temperature is exceeded, the car should be stopped immediately to find out the cause and eliminate it;
4. before stopping, the material should be stopped first and the power can be turned off until the material in the broken chamber is completely discharged;
5. when broken, if the material is blocked due to the blockage in the broken cavity, the power supply should be shut down immediately, and the material in the broken chamber can be cleaned before starting again;
The 6. jaw plate can be turned back after being worn;
7. the construction waste crusher after a period of time, should be the fixed bushing re tighten, in order to prevent the fixed bushing loose and damage machine.